Vibration-free foundations in the inner-city area of Harlingen

In Harlingen (The Netherlands), approximately 180 precast concrete piles were pushed into the soil by the Pile Pusher Pro on behalf of “Heijmans Woningbouw Noord”. The foundation piles vary in sizes from 290×290 mm to 320×320 mm with lengths between 14.25 and 22.00 m.   Foundations in city center without nuisance This concerns phase 2 of […]

Job description

Precast concrete pile pushed into the soil next to an adjacent building – Arnhem

163 precast concrete piles were used for the Accsys Technologies project in Arnhem (The Netherlands). The piles were pushed into the soil by the side piler at 80 cm next to an adjacent building with low noise and vibration-free conditions. Thanks to the Pile Pusher Pro foundation machine, the adjacent production process, which is sensitive […]

Job description

Next to train track in Hengelo: foundation piles pushed into the soil without nuisance

Next to the train track in Hengelo (The Netherlands) the foundation machine Pile Pusher Pro pushed precast concrete piles into soil within a few minutes. This in various positions without vibrations and noise problems. A total of 248 foundation piles were used in this project.   Project description – Pile Pusher Pro Client: Unibouw Total […]

Job description

420 prefab concrete piles needed for adjustment of St. Sebastiaansbrug in Delft (NL)

Together we build bridges: in Delft (The Netherlands) it was a challenge to adapt the bridge “St. Sebastiaansbrug”. The Pile Pusher Pro proved to be the right choice. The vibration-free and, above all, consistent foundation of the precast concrete piles was an indispensable addition to the projec. In total, no fewer than 420 foundation piles […]

Job description