Next to the train track in Hengelo (The Netherlands) the foundation machine Pile Pusher Pro pushed precast concrete piles into soil within a few minutes. This in various positions without vibrations and noise problems. A total of 248 foundation piles were used in this project.
Project description – Pile Pusher Pro
- Client: Unibouw
- Total pushed meters: approx. 2100 m
- Number of precast concrete piles: 248
- Pile length: 7 – 10 m
- Realisation: 2017